← All bills · H.R. 7977 · Introduced Mar 18, 2026

Energy Bills Relief Act

What it says it's for

To provide relief from high energy bills, and for other purposes.

Policy area: Energy

Latest action (Mar 18, 2026): Referred to the Committee on Energy and Commerce, and in addition to the Committees on Agriculture, Ways and Means, Natural Resources, Financial Services, Transportation and Infrastructure, Education and Workforce, Oversight and Government Reform, and Science, Space, and Technology, for a period to be subsequently determined by the Speaker, in each case for consideration of such provisions as fall within the jurisdiction of the committee concerned.

Read it on congress.gov ↗Full text (XML)

Sus-Meter · its most off-topic section

61👀 Something's off

1 side quest · 1 kinda off · 48 of 49 sections checked

Side quests detected 👀

Side questTitle VII—Collaborating with communities for successful deployment

Sec. 702. Interagency environmental data system

“Habibi, you came for a lower energy bill and got an AI-powered permit portal with 3D renderings. That's one elaborate side quest.”

What it does: Requires the Chair of the Council on Environmental Quality to publish data standards within 60 days and guidance within 120 days, has agencies begin implementing them within 180 days, pilot shared services within 1 year, and build a unified interagency environmental review and authorization data system with a General Services-hosted online portal by December 1, 2027.

Read the section

702.Interagency environmental data system (a)Establishment of data standards (1)In generalNot later than 60 days after the date of enactment of this section, the Chair of the Council on Environmental Quality, in consultation with the Federal Permitting Improvement Steering Council, the Chief Information Officers Council, the Office of Management and Budget, and other relevant stakeholders and Federal agencies, shall develop, publish, and iteratively update data standards for the collection and curation of authorization data by Federal agencies, which shall be used to— (A)assist with environmental reviews and authorizations; (B)organize, define, and standardize various concepts, formats, and…

Sus score (the blend below)
61
Off-topic (60%)
64%
Touches another program (25%)
90%
Names a specific place or project (15%)
5%
Judge confidence
70%
Defense's case (flag stands under 50%)
31%
Kinda offTitle IV—Building out a 21st century electricity grid › Subtitle C—Transmission governance reform

Sec. 422. FERC fee assessments

“Habibi, I came for cheaper energy bills and got a once-every-5-years check on whether the Commission's own fees cover its workload.”

What it does: Section 422 amends Section 3401 of the Omnibus Budget Reconciliation Act of 1986 (42 U.S.C. 7178) to require the Commission to review, at least once every 5 years, whether the fees and charges it assesses under that section and other laws are sufficient to let it handle its workload in an expedient manner.

Read the section

422.FERC fee assessmentsSection 3401 of the Omnibus Budget Reconciliation Act of 1986 (42 U.S.C. 7178) is amended by adding at the end the following: (h)ReviewNot less often than once every 5 years, the Commission shall undertake a review to determine if the fees and charges it assesses under this section and other laws are sufficient to allow the Commission to handle its workload in an expedient manner. .

Sus score (the blend below)
52
Off-topic (60%)
59%
Touches another program (25%)
64%
Names a specific place or project (15%)
5%
Judge confidence
67%
Defense's case (flag stands under 50%)
35%

All 49 sections

Grouped by title. Tap one to open it.

Opening sections1 section
  1. Not scored
    Sec. 1. Short title; table of contents

    Standard boilerplate

    1.Short title; table of contents (a)Short titleThis Act may be cited as the Energy Bills Relief Act. (b)Table of contentsThe table of contents for this Act is as follows: Sec. 1. Short title; table of contents. Title I—Reversing attacks on low-cost, clean energy Subtitle A—Restoring tax credits for low-Cost, clean energy Sec. 101. Repealing H.R. 1 rollbacks of low-cost, clean energy tax credits. Subtitle B—Stopping administration overreach against low-Cost, clean energy Sec. 111. Reversing grant terminations for low-cost, clean energy. Sec. 112. Prevention of administrative abuse of Federal permitting of low-cost, clean energy. Sec. 113. Ratepayer protection against uneconomic power…

Title I: Reversing attacks on low-Cost, clean energy4 sections
  1. On topic
    Sec. 101. Repealing H.R. 1 rollbacks of low-cost, clean energy tax credits

    101.Repealing H.R. 1 rollbacks of low-cost, clean energy tax credits (a)RepealSubchapter A of chapter 5 of subtitle A of title VII of Public Law 119–21 is hereby repealed. (b)AmendmentsEach provision of law amended by such subchapter is amended to read as such provision would read if such subchapter had never been enacted. (c)EffectsEach amendment made by subsection (b) shall take effect as if included in the provision of such subchapter to which such amendment relates.

  2. On topic
    Sec. 111. Reversing grant terminations for low-cost, clean energy

    111. Reversing grant terminations for low-cost, clean energy (a) The Department of Energy, the Environmental Protection Agency, and the Department of Transportation may not terminate a Federal award in part or its entirety, require a renegotiation or rescoping of the Federal award, or decide not to fund a future budget period of a Federal award on the basis that the Federal award no longer effectuates the program goals or agency priorities, including pursuant to section 200.340(a)(4) of title 2, Code of Federal Regulations. (b) Any Federal award that was terminated, renegotiated, rescoped, or not progressed to future budget periods by the Department of Energy, the Environmental Protection…

  3. Judge unsure
    Sec. 112. Prevention of administrative abuse of Federal permitting of low-cost, clean energy

    112. Prevention of administrative abuse of Federal permitting of low-cost, clean energy (a) Requirement for parity The Council on Environmental Quality, in consultation with all applicable Federal agencies, shall ensure, via subsection (b), that the processing of applications, authorizations, or related approvals as well as denials and the activities referenced in subsection (g) for wind, solar, storage, or related electric transmission projects on Federal and non-Federal land and waters is not subject to more restrictive or burdensome procedural requirements than those applied to applications for oil, gas, or coal projects on Federal and non-Federal land and waters and does not bias…

  4. On topic
    Sec. 113. Ratepayer protection against uneconomic power generation

    113. Ratepayer protection against uneconomic power generation Section 202(c) of the Federal Power Act (16 U.S.C. 824a) is amended— (1) in paragraph (1)— (A) by striking Commission after During the continuance of any war in which the United States is engaged, or whenever the and inserting Secretary of Energy (referred to in this subsection as the Secretary); (B) by striking exists after determines that an emergency and inserting currently exists or will occur within 6 months; (C) by striking Commission after or other causes, the and inserting Secretary; (D) by inserting As part of the order, the Secretary shall explain why such order best meets the emergency and serves the public interest.…

Title II: Cutting energy bills for American families5 sections
  1. On topic
    Sec. 201. Lowering household heating and cooling bills

    201.Lowering household heating and cooling bills (a)FundingSection 2602 of the Low-Income Home Energy Assistance Act of 1981 (42 U.S.C. 8621) is amended— (1)in subsection (b)— (A)by striking section 2607A) and inserting section 2604(e), 2605(u), 2607A, 2607B, or 2607C); and (B)by striking $2,000,000,000 and all that follows and inserting such sums as may be necessary, including such sums as may be necessary to enable the States to assist all households that meet the eligibility requirements established under this title and to enable States to implement home energy affordability measures described in section 2605(b)(3).; (2)in subsection (e), in the first sentence— (A)by striking in each…

  2. On topic
    Sec. 202. Home weatherization

    202.Home weatherization (a)Enhancement and innovationSection 414D of the Energy Conservation and Production Act (42 U.S.C. 6864d) is amended by striking subsection (k). (b) Average cost per dwelling unit Section 415(c)(1) of the Energy Conservation and Production Act (42 U.S.C. 6865(c)(1)) is amended by striking $6,500 and inserting $12,000. (c)Clarification of reweatherization limitationSection 415(c)(2) of the Energy Conservation and Production Act (42 U.S.C. 6865(c)(2)) is amended— (1)by striking , or under other Federal programs; (2)by striking , may and inserting may; and (3)by striking or under other Federal programs, or from receiving non-Federal assistance for weatherization.…

  3. On topic
    Sec. 203. Reflective roofing

    203.Reflective roofing (a)EstablishmentThe Secretary shall establish and carry out a program to provide rebates to eligible households for the purchase and installation of eligible cool roof products. (b)Rebate amountThe amount of a rebate provided under the program established under subsection (a) shall be— (1)with respect to an eligible cool roof product installed on a low-sloped roof— (A)$0.25 per square foot if such eligible cool roof product has— (i)a minimum 3-year aged solar reflectance of 0.65 and a minimum 3-year-aged thermal emittance of 0.75; or (ii)a minimum 3-year aged Solar Reflectance Index of 78; and (B)$0.75 per square foot if such eligible cool roof product has— (i)a…

  4. On topic
    Sec. 204. Domestic natural gas price protection

    204.Domestic natural gas price protection (a)Exportation of natural gas (1)Exportation of natural gasSection 3 of the Natural Gas Act (15 U.S.C. 717b) is amended by adding at the end the following: (g)Exportation of natural gas (1)Order requiredNo person shall export any natural gas from the United States to a foreign country without first having secured an order of the Secretary of Energy authorizing it to do so. The Secretary of Energy may issue such order upon application only if, after opportunity for hearing, the Secretary of Energy finds that the proposed exportation will be consistent with the public interest. The Secretary of Energy may by its order grant such application, in whole…

  5. On topic
    Sec. 205. Rural energy savings

    205.Rural energy savingsSection 6407 of the Farm Security and Rural Investment Act of 2002 (7 U.S.C. 8107a) is amended— (1)in subsection (b)— (A)in paragraph (1)— (i)in subparagraph (B), by striking or at the end; (ii)by redesignating subparagraph (C) as subparagraph (D); and (iii)by inserting after subparagraph (B) the following: (C)any Indian Tribe (as defined in section 4 of the Indian Self-Determination and Education Assistance Act (25 U.S.C. 5304)); ; (2)in subsection (c)— (A)in the subsection heading, by inserting and grants after Loans; (B)by striking paragraph (1) and inserting the following: (1)In generalSubject to the requirements of this subsection, the Secretary shall provide—…

Title III: Unclogging the low-cost, clean energy bottleneck6 sections
  1. On topic
    Sec. 301. Expedited generator interconnection

    301.Expedited generator interconnection (a)DefinitionsIn this section: (1)Advanced transmission technologyThe term advanced transmission technology means any hardware or software that— (A)increases the capacity, efficiency, reliability, resilience, or safety of transmission facilities and transmission technologies; (B)is installed in addition to new or existing transmission facilities and transmission technologies— (i)to give operators of the transmission facilities and transmission technologies more situational awareness and control over the electric grid; (ii)to make the transmission facilities and transmission technologies more efficient; or (iii)to increase the transfer capacity of the…

  2. On topic
    Sec. 302. Advanced transmission technologies

    302.Advanced transmission technologies (a)DefinitionsIn this section: (1)CommissionThe term Commission means the Federal Energy Regulatory Commission. (2)Advanced transmission technologyThe term advanced transmission technology means any hardware or software that— (A)increases the capacity, efficiency, reliability, resilience, or safety of transmission facilities and transmission technologies; (B)is installed in addition to new or existing transmission facilities and transmission technologies— (i)to give operators of the transmission facilities and transmission technologies more situational awareness and control over the electric grid; (ii)to make the transmission facilities and…

  3. Judge unsure
    Sec. 303. Electricity transformers

    303.Electricity transformers (a)Defense Production ActThere is authorized to be appropriated $2,100,000,000 for the President, acting through the Secretary of Energy, under the authority of title III of the Defense Production Act of 1950 (50 U.S.C. 4531 et seq.), to expand domestic manufacturing of transformers and grid components, including amorphous steel, grain-oriented electrical steel, flexible transformers, circuit breakers, switchgear and substations to serve load and interconnect generation, and inverters and optimizers to integrate the influx of distributed generators. (b)Strategic Transformer Resilience Program (1)DefinitionsIn this section: (A) Bulk-power system; Electric…

  4. On topic
    Sec. 304. Streamlining permitting of distributed energy

    304.Streamlining permitting of distributed energy (a)DefinitionsIn this section: (1)Authority having jurisdictionThe term authority having jurisdiction means any State, county, local, or Tribal office or official with jurisdiction— (A)to issue permits relating to qualifying distributed energy systems; (B)to conduct inspections to enforce the requirements of a relevant code or standard relating to qualifying distributed energy systems; or (C)to approve the installation of, or the equipment and materials used in the installation of, qualifying distributed energy systems. (2)Qualifying distributed energy systemThe term qualifying distributed energy system means any equipment or materials…

  5. On topic
    Sec. 305. Community solar

    305.Community solar (a)Establishment of community solar consumer choice program (1)In generalNot later than 12 months after the date of enactment of this Act, the Secretary shall establish a program to increase the opportunities for participation in community solar programs by— (A)individuals, prioritizing individuals that do not have regular access to onsite solar, including low- and moderate-income individuals and individuals living in energy communities; (B)businesses; (C)nonprofit organizations; and (D)States and local and Tribal governments. (2)Alignment with existing Federal programsThe Secretary shall align the program established under paragraph (1) with existing Federal programs…

  6. On topic
    Sec. 306. Low-cost, clean energy in United States territories

    306.Low-cost, clean energy in United States territories (a)Clean energy grant program (1)EstablishmentNot later than 180 days after the date of enactment of this Act, the Secretary of Agriculture shall establish a renewable energy program (in this section referred to as the program) under which the Secretary may award grants to covered entities to facilitate projects, in territories of the United States, described in paragraph (3). (2)ApplicationsTo be eligible for a grant under the program, a covered entity shall submit to the Secretary an application at such time, in such form, and containing such information as the Secretary may require. (3)Grant uses (A)In generalA covered entity…

Title IV: Building out a 21st century electricity grid15 sections, 1 flagged
  1. Defense won
    Sec. 401. Definitions

    401.DefinitionsSection 3 of the Federal Power Act (16 U.S.C. 796) is amended by adding at the end the following: (30) Energy storage project The term energy storage project means equipment that receives, stores, and delivers energy-using batteries, compressed air, pumped hydropower, hydrogen storage (including hydrolysis), thermal energy storage, regenerative fuel cells, flywheels, capacitors, superconducting magnets, or other technologies identified by the Secretary of Energy. (31)Generating facilityThe term generating facility means any facility that generates electricity. (32)Generator tie lineThe term generator tie line means a dedicated transmission line that is used to transmit power…

  2. On topic
    Sec. 402. Interregional electric transmission planning

    402.Interregional electric transmission planningPart II of the Federal Power Act (16 U.S.C. 824 et seq.) is amended by adding at the end the following: 224.Improving interregional electric transmission planning (a)In generalNot later than 6 months after the date of enactment of this section, the Commission shall issue regulations that require each pair or grouping of neighboring transmission planning regions to jointly develop and file with the Commission a process by which they will develop an interregional transmission plan to identify and to facilitate the construction or upgrade of onshore and offshore electric transmission facilities that are efficient, cost-effective, and broadly…

  3. Judge unsure
    Sec. 403. Allocation of costs of electric transmission facilities of national significance

    403.Allocation of costs of electric transmission facilities of national significancePart II of the Federal Power Act (16 U.S.C. 824 et seq.) is further amended by adding at the end the following: 225.Allocation of costs of transmission facilities of national significance (a)Allocation of costs (1)In generalAny transmitting utility that owns, controls, or operates a transmission facility of national significance, or proposes to own, control, or operate a transmission facility of national significance, may file a tariff with the Commission in accordance with section 205 allocating the costs of constructing, modifying, and operating such transmission facility of national significance in…

  4. On topic
    Sec. 404. Minimum interregional transfer capability

    404.Minimum interregional transfer capability Part II of the Federal Power Act (16 U.S.C. 824 et seq.) is further amended by adding at the end the following: 226.Protecting electricity reliability by improving interregional transfer capability (a)RulemakingNotwithstanding the requirements of section 322 of the Fiscal Responsibility Act (Public Law 118–5), not later than 24 months after the date of enactment of the Energy Bills Relief Act, the Commission shall, pursuant to section 206, issue regulations that establish requirements for minimum transfer capability, as described under subsection (b), between transmission planning regions. (b)Minimum transfer capabilityThe aggregate minimum…

  5. Judge unsure
    Sec. 405. Increased FERC transmission siting authority

    405.Increased FERC transmission siting authority (a)In generalPart II of the Federal Power Act (16 U.S.C. 824 et seq.) is further amended by adding at the end the following: 227.Siting of certain interstate electric transmission facilities (a)Certificate of public convenience and necessity (1)In generalOn receipt of an application under subsection (b)(1) relating to a transmission facility of national significance described in paragraph (2), the Commission, after making the finding described in paragraph (3) with respect to such transmission facility of national significance, shall, by order which is published in the Federal Register, issue to the person who submitted such application a…

  6. Judge unsure
    Sec. 406. Prohibiting expensive, unjust queue jumping

    406.Prohibiting expensive, unjust queue jumpingPart II of the Federal Power Act (16 U.S.C. 824 et seq.) is further amended by adding at the end the following: 228.Limitation on certain procedures to expedite interconnection requests (a)LimitationThe Commission may not establish or authorize a covered procedure unless— (1)the Commission finds, by clear and convincing evidence and in accordance with subsection (b), that reliance upon existing procedures for processing interconnection requests would jeopardize the reliable operation of the bulk-power system by failing to address predicted demand for electric energy; (2)such covered procedure— (A)provides only for a one-time opportunity to…

  7. On topic
    Sec. 411. Transmission investment tax credit

    411.Transmission investment tax credit (a)In generalSubpart E of part IV of subchapter A of chapter 1 of the Internal Revenue Code of 1986 is amended by inserting after section 48E the following: 48F.Qualifying electric power transmission line credit (a)Allowance of creditFor purposes of section 46, the qualifying electric power transmission line credit for any taxable year is an amount equal to 6 percent of the qualified investment for such taxable year with respect to any qualifying electric power transmission line property of the taxpayer. (b)Qualified investment (1)In generalFor purposes of subsection (a), the qualified investment for any taxable year is the basis of any qualifying…

  8. Judge unsure
    Sec. 412. Reduced wildfire risks to the grid

    412.Reduced wildfire risks to the grid (a)DefinitionsIn this section: (1)Eligible entityThe term eligible entity means— (A)an electric grid operator; (B)an electricity storage operator; (C)an electricity generator; (D)a transmission owner or operator; (E)a distribution provider; (F)a fuel supplier; and (G)any other relevant entity, as determined by the Secretary. (2)Power lineThe term power line includes a transmission line or a distribution line, as applicable. (3)ProgramThe term program means the program established under subsection (b). (b)Establishment of programNot later than days after the date of enactment of this Act, the Secretary shall establish a program under which the Secretary…

  9. Defense won
    Sec. 421. FERC staffing

    421.FERC staffing (a)Ensuring timely review of infrastructureSection 401(k) of the Department of Energy Organization Act (42 U.S.C. 7171(k)) is amended— (1)in paragraph (1), by striking subchapter III of; (2)in paragraph (2)— (A)by striking subparagraph (A); and (B)by redesignating subparagraphs (B) through (E) as subparagraphs (A) through (D), respectively; and (3)in paragraph (6)— (A)by striking The Chairman and inserting the following: (A)In generalThe Chairman; and (B)by adding at the end the following: (B)Implementation planNot later than 90 days after the date of enactment of this subparagraph, the Chairman shall submit to the Director of the Office of Personnel Management a plan to…

  10. Kinda offSec. 422. FERC fee assessments ↑
  11. Judge unsure
    Sec. 423. State public utility commission capacity grants

    423.State public utility commission capacity grants (a)EstablishmentNot later than 2 years following the enactment of this title, the Secretary of Energy shall establish a program under which the Secretary shall award grants to State regulatory authorities to increase the capacity of said authorities to evaluate filings made by utilities related to transmission and integrated resource plans, including through the hiring of economic modelers, engineers, and others with relevant expertise. (b)Authorization of appropriationsThere are authorized to be appropriated to the Secretary of Energy such sums as may be necessary to carry out this section.

  12. Judge unsure
    Sec. 424. Independent transmission monitors

    424.Independent transmission monitors (a)In generalNot later than 180 days after the date of enactment of this section, the Commission shall— (1)require each transmission planning region to establish an independent entity to monitor the planning for, and operation of, transmission facilities in the transmission planning region; or (2)establish an independent entity to monitor the planning for, and operation of, transmission facilities in all transmission planning regions. (b)Role of transmission monitorAn independent entity described in subsection (a) shall provide independent analysis of transmission planning and ratemaking processes by the Commission and Transmission Organizations to…

  13. On topic
    Sec. 425. Aggregator bidding into organized wholesale electric markets

    425.Aggregator bidding into organized wholesale electric markets (a) In general Notwithstanding any prohibition established by a relevant electric retail regulatory authority with respect to who may bid into an organized wholesale electric market, each Transmission Organization shall, with respect to the organized wholesale electric market controlled by the Transmission Organization, allow any bid from an aggregator of retail customers that aggregates the demand flexibility of the customers of utilities that distributed more than 4 million megawatt-hours in the previous fiscal year. Such flexibility may be achieved through demand response, distributed generation, distributed storage, and…

  14. Judge unsure
    Sec. 426. RTO and ISO governance and participation

    426.RTO and ISO governance and participation (a) Technical Conference Not later than 120 days after the date of enactment of this section, the Federal Energy Regulatory Commission shall convene a technical conference to consider Regional Transmission Organization and Independent System Operator independence from their members interests, the responsiveness of RTOs and ISOs to consumers and other stakeholders, and ways for RTOs and ISOs to increase the equitable treatment of consumers and other stakeholders, including the effectiveness of stakeholder policies and procedures adopted in compliance with the final rule entitled Wholesale Competition in Regions With Organized Electric Markets…

  15. On topic
    Sec. 427. Modernized grid data and analytics

    427.Modernized grid data and analytics (a)Modernization of reporting information and data under the Federal Power Act (1)In generalThe Commission shall, by rule, standardize the manner in which information and data is reported by transmitting utilities and Transmission Organizations to the Commission under the Federal Power Act (16 U.S.C. 972 et seq.) in accordance with this subsection. (2)Content of reports requirementsIn carrying out paragraph (1), the Commission shall require the information and data that will be reported, as it applies to projects, existing assets, or systems owned or operated by a transmitting utility or Transmission Organization, to include the following:…

Title V: Deploying low-cost, clean energy responsibly on public lands and waters6 sections
  1. On topic
    Sec. 501. Public land renewable energy development

    501.Public land renewable energy development (a)DefinitionsIn this Act: (1)Covered landThe term covered land means land that is— (A)Federal land; (B)not excluded from the development of geothermal, solar, or wind energy under— (i)a land use plan; or (ii)other Federal law; and (C)not included in an area— (i)that is subject to the Desert Renewable Energy Conservation Plan developed by the California Energy Commission, the California Department of Fish and Wildlife, the Bureau of Land Management, and the United States Fish and Wildlife Service; or (ii)for which the Secretary determines existing wind and solar energy land use planning meets or exceeds the standards established under section 3.…

  2. Judge unsure
    Sec. 502. Geothermal cost recovery

    502.Geothermal cost recovery (a)Cost recovery from geothermal leasing, permitting, and inspectionsSection 6 of the Geothermal Steam Act of 1970 (30 U.S.C. 1005) is amended by adding at the end the following: (j)Cost recovery (1)In generalDuring the period that begins on the date of enactment of this subsection and ends September 30, 2033, the Secretary may require an applicant for, or a holder of, a geothermal lease to reimburse the United States for all reasonable administrative and other costs incurred by the United States from— (A)processing the application for the geothermal lease, including any application for an operations plan, geothermal drilling permit, utilization plan, site…

  3. Judge unsure
    Sec. 503. Geothermal Gold Book development

    503.Geothermal Gold Book development (a)IdentificationNot later than 1 year after the date of enactment of this section, the Department of the Interior, in consultation with other relevant Federal agencies, shall identify standard procedures and guidelines for efficient and environmentally responsible geothermal leasing and permitting. (b)PublicationNot later than 180 days after identifying standard procedures and guidelines under subsection (a), the Department of the Interior shall publish a Gold Book containing such standard procedures and guidelines for use by the field offices of the Bureau of Land Management and geothermal operators. (c)ConsultationBefore publishing the Gold Book, the…

  4. Judge unsure
    Sec. 511. Responsible development of offshore renewable energy

    511.Responsible development of offshore renewable energy (a)DefinitionsSection 2 of the Outer Continental Shelf Lands Act (43 U.S.C. 1331) is amended— (1)in the second subsection (r), as added by section 50251(b)(1)(A)(iv) of Public Law 117–169— (A)by redesignating such subsection (r) as subsection (t); and (B)by inserting after the enumerator State.—; and (2)by adding at the end the following: (u)Offshore renewable energy projectThe term offshore renewable energy project means a project to carry out an activity described in section 8(p)(1)(C) related to wind, solar, wave, or tidal energy.. (b)National Policy for the Outer Continental ShelfSection 3 of the Outer Continental Shelf Lands Act…

  5. Judge unsure
    Sec. 512. Compensation for offshore renewable energy projects

    512.Compensation for offshore renewable energy projectsThe Outer Continental Shelf Lands Act (43 U.S.C. 1331 et seq.) is amended by adding at the end the following: 34.Offshore Renewable Energy Compensation Fund (a)EstablishmentThere is established in the Treasury of the United States the Offshore Renewable Energy Compensation Fund, which shall be used by the Secretary, or a third-party the Secretary enters into a contract with, to provide to covered entities— (1)payments for claims— (A)described under subsection (f)(1); and (B)verified pursuant to subsection (d)(1); and (2)grants to carry out mitigation activities described in subsection (f)(2). (b)Availability of fundThe Fund shall be…

  6. Judge unsure
    Sec. 513. Interoperability of offshore electric transmission infrastructure

    513.Interoperability of offshore electric transmission infrastructure (a)StudyNot later than 2 years after the date of enactment of this Act, the Secretary of Energy shall complete and publish on the website of the Department of Energy a study that assesses the need to, and challenges of, developing and standardizing interoperable electric grid components, systems, and technologies in support of shared offshore transmission networks. Such study shall include recommendations for Congress, State, Tribal, and local governments, manufacturers of electric grid components, systems, and technologies, Transmission Organizations, offshore electricity generation project developers, and appropriate…

Title VI: Protecting consumers in electricity regulation5 sections
  1. On topic
    Sec. 601. Utility earnings tied to ratepayer benefits

    601.Utility earnings tied to ratepayer benefits (a)Amendments to the Federal Power Act (1)In generalSection 219 of the Federal Power Act (16 U.S.C. 824s) is amended— (A)in subsection (a)— (i)by striking Not later than 1 year after the date of enactment of this section, the Commission shall establish, by rule, and inserting The Commission shall issue such rules as may be necessary to establish; and (ii)by inserting , improving efficiency, after ensuring reliability; (B)in subsection (b)— (i)in the matter preceding paragraph (1), by striking The rule shall and inserting The rules issued under this section shall; (ii)in paragraph (1), by inserting , and operational improvements for, after…

  2. On topic
    Sec. 602. Consumer protection from energy market manipulation

    602.Consumer protection from energy market manipulation (a)Amendments to the Federal Power Act (1)Enforcement of certain provisionsSection 316A of the Federal Power Act (16 U.S.C. 825o–1) is amended by adding at the end the following: (c)Prohibition or suspension for violationsThe Commission may prohibit, conditionally or unconditionally, permanently or for such period of time as the Commission determines to be appropriate, any person who is engaged or has engaged in practices constituting a violation of section 221 or 222 (and related rules and regulations) from engaging, directly or indirectly, in the business of purchasing or selling— (1)electric energy; (2)electric energy products,…

  3. On topic
    Sec. 603. Avoiding cost shifts onto families

    603.Avoiding cost shifts onto families (a)In generalSection 111(d) of the Public Utility Regulatory Policies Act of 1978 (16 U.S.C. 2621(d)) is amended by adding at the end the following: (22)Large load facility class (A)ClassificationLarge load facilities shall be considered a class of electric consumers. (B)Cost recovery relating to large load facility classEach electric utility that provides electric service to a class of electric consumers described in subparagraph (A) shall fully recover from such class all costs associated with any upgrade made to the generation, transmission, or distribution facilities of the electric grid, including local facilities, in order to meet the demand for…

  4. Judge unsure
    Sec. 604. True costs and value of energy for economic and public benefit

    604.True costs and value of energy for economic and public benefit (a)Energy productivity assessments (1)Baseline assessmentNot later than 2 years after the date of enactment of this Act, the Secretary of Energy, in consultation with the Task Force established under subsection (c) of this Act, shall publish a comprehensive baseline assessment of energy productivity in the United States, which shall, at a minimum— (A)define a framework and methodology for measuring energy productivity as the relationship between energy inputs and the economic or societal value of the work performed by those inputs, at the national, regional, and sectoral levels; (B)evaluate current energy productivity…

  5. On topic
    Sec. 605. Grid performance disclosure

    605.Grid performance disclosure (a)Electricity transmission scorecard elements and verification (1)Reporting requirements (A)Covered transmission owner scorecards (i)In generalThe Commission shall require each covered transmission owner to annually develop, publish, and submit to the Commission and the Secretary a report, to be known as a transmission owner scorecard, that includes metrics that are standardized as required under paragraph (2) and evaluate the following: (I)Ratepayer affordability, which shall assess the cost of transmission services per unit of energy transmitted or other metrics that can be used to assess affordability of energy provided to ratepayers. (II)Financing costs,…

Title VII: Collaborating with communities for successful deployment7 sections, 1 flagged
  1. Judge unsure
    Sec. 701. Federal permitting capacity

    701.Federal permitting capacity (a) In general To the maximum extent practicable, the head of each agency listed under section 41002(b)(2)(B) of the FAST Act (42 U.S.C. 4370m–1(b)(2)(B)), including the head of any agency invited pursuant to clause (xiv) of such subparagraph (B), shall maintain adequate personnel capacity and expertise to process authorizations and environmental documents for projects in a timely manner, including in compliance with sections 107(g) and 112(a)(4) of the National Environmental Policy Act of 1969 (42 U.S.C. 4336a(g) and 4336f(a)(4)). (b)AssessmentNot later than 90 days after the date of enactment of this section, the head of each agency described in subsection…

  2. Side questSec. 702. Interagency environmental data system ↑
  3. Judge unsure
    Sec. 703. Timely public release of NEPA documentation

    703.Timely public release of NEPA documentation (a)In generalTo achieve the goals described in section 1507.4 of title 40, Code of Federal Regulations (or a successor regulation), to allow agencies and the public to efficiently and effectively access timely information relating to environmental reviews required under the National Environmental Policy Act of 1969 (42 U.S.C. 4321 et seq.), the lead agency for a proposed major Federal action shall make the documents identified under subsection (b) with respect to such proposed major Federal action available to the public in a searchable, digital format when such documents are completed by the lead agency, or in the case of final documents,…

  4. Judge unsure
    Sec. 704. Community benefits agreements

    704.Community benefits agreements (a)Prioritization in NEPAIf a project sponsor has entered into a community benefits agreement described in subsection (b) with respect to an eligible project, the applicable lead agency shall prioritize the completion of the required environmental documents for the eligible project. (b)Community benefits agreement (CBA)A project sponsor and a CBA partner may enter into an agreement that— (1)relates to an eligible project for which an authorization is sought; (2)may include the disbursement of funds, including commitments, for social, economic, or environmental benefits that will— (A)ensure benefits from the construction, modification, and operation of the…

  5. Judge unsure
    Sec. 705. Intervenor funding at FERC Office of Public Participation

    705.Intervenor funding at FERC Office of Public Participation (a)In generalSection 319(b)(2) of the Federal Power Act (16 U.S.C. 825q–l(b)(2)) is amended by striking The Commission may and inserting The Commission shall. (b)RulemakingNot later than 180 days after the date of enactment of this Act, the Federal Energy Regulatory Commission shall promulgate a final rule to provide compensation under section 319(b)(2) of the Federal Power Act (16 U.S.C. 825q–1(b)(2)), as amended by this section. Under such rule the Commission shall require that each intervenor or participant file a disclosure form of earned and unearned income to identify conflicts of interest. Such form shall not be overly…

  6. Judge unsure
    Sec. 706. Senior community engagement officers and Tribal community engagement officers

    706.Senior community engagement officers and Tribal community engagement officers (a)Designation of senior community engagement officers and Tribal community engagement officers (1)In generalThe head of each Federal agency required or authorized to complete an environmental document or an authorization for a major Federal action shall designate— (A)1 or more appropriate employees or officials of the applicable Federal agency to serve as a senior community engagement officer (referred to in this section as an SCO); and (B)1 or more appropriate employees or officials of the applicable Federal agency (other than an employee or official designated as an SCO under subparagraph (A)) to serve as a…

  7. Judge unsure
    Sec. 707. Capacity grants for permitting and community engagement

    707.Capacity grants for permitting and community engagement (a)In generalThe Administrator of the Environmental Protection Agency shall make grants to States, units of local government, and Indian Tribes which shall be used for purposes of— (1)increasing the capacity of such organizations to conduct activities related to proposed major Federal actions, and State, local, and Tribal environmental reviews, permits, and consultations, including by— (A)compiling data and conducting analyses, planning, and environmental review; (B)determining potential economic, social, public health, and environmental impacts; or (C)identifying opportunities to mitigate such impacts; (2)coordinating with…

Checked Nov 15, 2026 with Jev.